After silence of one week in the posts for the “Horizons vendéens“, you can find below the summary of the works, which still go on!

  • Front stone wall-to-be of the gite 2

As already explained in the previous posts, the wall -”built with breeze blocks-which is located on the front façade of the gite 2, should be covered with stones. Hereafter, the following steps since last November:

Horizons vendéens Gite 2 Horizons vendéens Gite 2
Horizons vendéens Gite 2
Horizons vendéens Gite 2 

After having laid the ”last” stones and the wood lintels on this wall of this gite, stoneworkers will make way for the workers for the stone face-lifting of this façade. Then, our website should be available on Internet…

 

  • Screed above the tiles in the gite 2

No photo can be available: indeed, the liquid screed was poured last Wednesday, so we should not walk on it for the moment and we should also avoid draughts in this gite because of risk of cracks inside the screed. Now wait and see for some weeks before the tiles can be seen on the floor…

 

  • Tiles in the pool area

All around the pool, in the changing room and also for the machines space, a “standard” screed has been poured and the tiler begins his work next week. Hereafter, photos of the screed:

Horizons vendéens gîtes avec piscine Horizons vendéens gîtes avec piscine Horizons vendéens gîtes avec piscine

 

  • Waste water from the gite 1 and from the gite 2

The waste water for the both gites and the changing room of the pool have been well connected to the town services. No photo should be needed to understand this part of work.

 

  • Earthworks begin in the back side of the gites and the pool

The earthworker ,as he was around the gites and the pool, began last week to level this surroundings, more precisely in the back side of the gites and the pool.

 

  • Ceilings in the gite 1

We have fallen the ceilings in rooms like bathrooms and toilets, but also in the living room and kitchen of the gite 1 so that all ceilings are the same and more precisely light. Indeed, we have choosen to lay white panellings so that all rooms should be bright at the most.

 